68 mw of solar power.
Sae group solar panels.
From consultation and design to quality installation and after sales servicing.
Sae group are celebrating 10 years in solar and more than 18 000 solar installations since 2010.
Seraphim are rated as the number one performing panel for two years running.
We hold iso accreditations 9001 as nzs 4801 for quality and safety.
Solar panels power systems tweed heads ballina sae group are your local experts in solar air conditioning electrical.
This is a standard of test designed to put a solar panel through its paces in terms of life expectancy and performance.
1300 18 20 50.
Now most solar panels try to get around this by dividing the panel into thirds with the aim to only reduce the panels output by a third too.
Take the power back.
19 million in savings back to australian homes and businesses per kwh.
Solar panels can only be added to the inverter if adding the extra solar panels keeps the voltages and current fed to the inverter within the operating window or working range of the inverter.
28 industry drive tweed heads south nsw 2486.
Solar panels need sunlight to work and even if there is a little bit of shade from dirt on one panel this can reduce the production for the entire string of panels.
Solar panels installed since 2010.
We are gold accredited master electricians first and foremost.
Tonnes co2 emissions less per annum.